| Work In Progress |
| Arizona Projects |
| Project Name: SKYTRAIN C23/C25 |
| Owner: City Of Phoenix |
| Contract Price: $11,367,441 |
| Brief Description: The C25 package for this project is to install utilities from the APS substation to the new APS yard located on 42nd street just south of Madison. The C23 package for this project is to install the propulsion power, City of Phoenix power, and the communications conduits to the propulsion buildings and the terminal electrical yards at the 44th street station, MSF train facility, East Economy Lot Station, and the Terminal 4 station. |
| |
| Project Name: P1270 BASEBUILD |
| Owner: MicroChip |
| Contract Price: $9,218,331 |
| Brief Description: Testing of existing Lighting Protection and Grounding Systems. Installation of owner furnished electrical power distribution equipment including switchboards, panelboards, transformers, and motor control centers. Installation of owner furnished equipment and enclosures including medium voltage switchgear, generators, and transformers. De install of existing medium and low voltage power distribution system including switchboards, panelboards, and transformers; and the Installation of new feeders and branch power distribution for all new owner furnished equipment. Installation of electrical systems for process equipment, mechanical, life safety, security, telecom, and instrumentation and controls systems. Installation to reconfigure existing lighting systems and new lighting systems. De install of existing end-of-life adjustable frequency drives and the installation of owner furnished new. Replacement of existing panelboard interiors and other EEW enhancements. |
| |
| Project Name: NAU WELLNESS CENTER |
| Owner: Northern Arizona University |
| Contract Price: $6,982,099 |
| Brief Description: We were involved as pre-construction lead and estimator. Multi use facility approx. 272,000 sf. Corbins Electric’s responsible to bring the medium voltage 12.470 voltage from the utility loop to a 2500KW 12.470 volt transformer to a 3000 amp 480/277 volt SES. Includes remodeling the grand stands and Musco lighting for the existing outdoor track and soccer field. Demo and rewiring of the existing facility will includes a Basketball Gym, Racquetball Courts, Climbing Wall and various Exercise Rooms. The new portion of the project includes a four-story building with exam rooms and classrooms and an indoor track and recreational area. |
| |
| Project Name: F08341 F32 P1268 IQ TOOL INSTALL |
| Owner: MicroChip |
| Contract Price: $3,945,009 |
| Brief Description: Install/Conversion of electrical facilities at a large microchip manufacturing facility in Chandler, Arizona. The project consists of Installing and/or converting 250 tools in an operating clean room environment. Electrical facilities run from the Utility level through multiple levels before reaching the tool itself. It is especially challenging because the factory was in full production while this install took place. |
| |
| New Mexico Projects |
| |
| Project Name: HOBBS HS NEW FR WING |
| Owner: City of Hobbs, New Mexico |
| Contract Price: $3,131,326 |
| Brief Description: New construction of approximately 122,000 square feet of a single story educational facility and central kitchen with related site improvements. |
| |
| Project Name: Los Alamos WVA |
| Owner: Los Alamos National Labs |
| Contract Price: $1,770,821 |
| Brief Description: This project is an upgrade to the existing security systems for a technical area that deals with nuclear material. We are constructing a new vehicle access building and canopy including power, security, tele/data, and access control. |
| |
| Project Name: CAFB HANGAR |
| Owner: US Army Corps of Engineers |
| Contract Price: $1,603,240 |
| Brief Description: Construction of a 35,000 sq/ft maintenance hangar for C130 aircraft. This includes the installation of (2) medium voltage pad mount transformers, 400Hz electrical system, Fire Alarm, and Tele/data systems. This project also includes a 10,000 foot long communications duct bank with (20) 12'x6'x6' manholes. |
| |
| Project Name: KAFB APRON LIGHTING |
| Owner: Kirtland Air Force Base |
| Contract Price: $1,390,969 |
| Brief Description: This project consist of the upgrade of the lighting on the aprons for (3) aircraft hangars. We are installing 65 light cages on top of the existing hangars while the hangars are operational and occupied. |
| |
| |
| Project Name: KIRTLAND AFB |
| Owner: Kirtland Air Force Base |
| Contract Price: $831,673 |
| Brief Description: This project consists of the replacement of an aging electrical system in the base command building. We are replacing all of the feeders, transformers, panelboards and distribution boards. This project requires all systems to be replaced while the building is fully occupied and operational not causing more than a 12-hour outage to the facility. |